Plumbing estimate or quote: what you are agreeing to

A scope of works template for your job

A scope of works is a written list of what the job includes, what it leaves out and what finished looks like. Send the same one to every business you ask, and the prices that come back are far easier to compare.

Template

Copy this into a document and delete the lines that do not apply.

Property and contact

  • Address, property type and floor
  • Owner, tenant, landlord or managing agent
  • Access, parking and lift arrangements

The problem or aim

  • What happens now, since when, and what you want instead

Work included

No. Task Location Finished when
1 Remove existing basin and tap Bathroom Pipes capped, no drips
2 Fit new basin, tap and trap Same position Runs and drains, joints dry
3 Fit isolation valves Basin supplies Each valve shuts off flow

Goods and materials

  • Item, make and model, who buys it, who stores it

Not included

  • Tiling, decorating, electrics, flooring, or whatever you will arrange elsewhere

Making good and waste

  • Which surfaces will be repaired, to what stage, and who removes debris

Conditions

  • Working hours, water shut-off notice, pets, protection of floors

Approvals

  • Who applies for building control, water company or freeholder consent

Testing and handover

  • Checks to be done in your presence, certificates, manuals, valve locations

Price and programme

  • Total including VAT, stage payments, start date, finish date, price validity

Filled example: replacing a bathroom suite

An invented job to show the level of detail. Change every line to match yours.

No. Task Finished when
1 Protect hall floor and stairs Covers down before removal starts
2 Isolate water to the bathroom Other outlets stay on where the pipework allows
3 Remove bath, basin and toilet Open pipes capped, waste opening covered
4 Report floor and pipe condition Written note and photos before refitting
5 Fit isolation valves to new fittings Each valve stops its supply
6 Fit bath, taps, waste and panel Filled and drained with no leaks, panel removable
7 Fit basin, tap and trap in same position Dry joints after a full basin is emptied
8 Fit toilet on existing waste position Flushes and refills, base and joint dry
9 Seal around bath and basin Sealant continuous, curing time stated
10 Make good pipe entry holes Ready for the owner's decorator
11 Remove old suite and debris Nothing left on the property or pavement
12 Handover Owner shown valves, receives manuals and any certificates

Not included: tiling, painting, flooring and electrical work. Goods: owner buys the suite and taps; the business supplies pipe, valves, wastes and sealant.

Blank template to send each builder or plumber

No. Task Location Finished when
1
2
3
4
5
6

Not included: ______

Goods and who buys them: ______

Version and date: ______

Builder quote template: the reply to ask for

Send this with the scope, and ask each business to fill it in. Many of these headings reflect what Citizens Advice says to look for in a quote and a written contract.

Heading Business to complete
Legal name, business address, contact
Quote number, date and scope version priced
Fixed price or estimate
Labour, by task number
Materials, by task number
Allowances for unknown work
Not included
VAT: included, added or not charged
Price valid until
What could change the price, and how it is approved
Start date and expected finish
Deposit and stage payments, each tied to a result
Subcontractors
Waste removal and tidying

Scope, quote or schedule of works?

  • A scope of work is a general description of the work to be delivered, including exclusions.
  • A schedule of work is an itemised list of work to be priced, without measured quantities, often used on smaller or alteration projects. The two terms are sometimes used interchangeably.
  • A quote is the business's price for doing the work described.

How to write the lines

Describe outcomes you can observe. "Sort out the shower" can mean a new cartridge to one reader and a new valve to another. "Shower holds a steady temperature when the kitchen tap is run" sets a test, although the business may reply that your water system limits what is achievable. That reply is useful before anyone starts. Where the weak outlet is a shower, the written scope is discussed under showers by type and fault.

If you do not know the cause of a fault, say so. Ask for diagnosis as its own priced line, with a written finding, followed by a separate price for repair.

Where something cannot be settled yet, label it as an allowance. See provisional sums.

Worked example

Weak: "Replace bathroom pipes and check everything."

Stronger: "Replace the visible hot and cold supply pipes to the bath, from the existing tees under the floor to the tap connections. Add an isolation valve to each. Lift only the boards needed and refix them. Leave the bath panel off until the owner has seen the joints under running water. Report any other defective pipework in writing before touching it." If the schedule moves a cooker, name the gas cooker or hob connection as its own line.

The second version states the start and end of the pipe run, what will be disturbed, what the owner will inspect and what happens when something else turns up.

What to attach

Add dated photographs, a rough plan with fixture positions, product links or data sheets for goods you have chosen, and any lease or managing agent conditions. Cover personal items and documents before photographing a room. Tell each business if a photograph shows a feature you want kept, such as original tiles.

Why it matters legally

Citizens Advice says a quote should break down the work and materials, state how long the price lasts, say whether VAT is included and explain when the price can rise. It also advises a written contract covering timings, tidying up, materials, subcontractors and payment. A flush priced for a heating system can be checked against what a sludge flush should record.

Under the Consumer Rights Act, what a trader says or writes about the service can become a contract term where you relied on it. A scope that both sides confirm gives you a record of what that was. If the business answers with its own version, check which document the price refers to.

Keeping it current

Date the scope and number each version. When extras arise, add a line with its price and your written approval instead of editing the old one. At the end, walk through the table and mark each row. Open rows become your snag list.

You can also check the returned price with the quote checker.

To use your scope with us, paste its main lines into the free written quote form.

Questions people ask

What should a scope of works include?

The property and access details, the problem, each task with a finished standard, materials and who buys them, exclusions, making good, approvals, handover, and price terms.

Is a scope of works the same as a quote?

No. The scope describes the work. The quote is a business's price for doing it.

Who writes the scope of works?

A homeowner can write a plain one for a small job. For complex or structural work, ask the designer or surveyor to prepare it.

Is a scope of works legally binding?

It can form part of the contract if both sides agree it. Confirm which version the accepted price refers to.