The work
Who does each stage of the room
A quote for the pipe work in a bathroom should list strip out, first fix and second fix, then say who does each neighbouring job: electrics, ventilation, walls, floors, tiling, making good and waste. Work that everyone assumes someone else is doing is the main risk, so ask for one named coordinator. The pipe work is charged on weekdays at £95 an hour, at least one hour, before parts. Where only the tub is changing, the narrower brief for bath work applies.
The plumbing stages to price
Strip out. Supplies capped, old sanitaryware disconnected and removed.
First fix. New hot, cold, waste and heating pipe positions run before walls and floors close.
Second fix. Basin, toilet, bath, shower and radiator or towel rail connected and tested.
Ask for each stage to be listed with its own inclusions, and for hidden pipework to be pressure tested and photographed before covering.
Surrounding work to allocate
| Work | Question |
|---|---|
| Electrics | Who designs, installs and certifies? |
| Ventilation | Is a fan supplied, ducted and tested? |
| Floors and walls | Who levels, boards and waterproofs? |
| Tiling | Is cutting around fittings included? |
| Making good | Plaster, paint and doors |
| Waste | Skip, bags, parking arrangements |
Approvals
A like-for-like swap is often straightforward, while new drainage, new electrical circuits or structural alteration can bring building regulations into play. Read whether a new bathroom needs building regulations and ensure the document names who applies. Leaseholders may also need consent: see licence to alter. Hot water safety and sanitation requirements are described in Approved Document G.
Prepare your request
A dimensioned sketch showing existing and wanted positions, photographs of every wall and the floor below if visible, a product list with codes, the type of hot water system, and whether there is a second toilet. Say what you will buy yourself.
Living arrangements
Say if anyone in the home depends on the only toilet or bathing facility. The programme should show when each goes out of use, what temporary connection is offered, if any, and the state the room will be left in overnight. Agree where materials are stored where they stay dry, and who checks deliveries for damage, since a cracked basin found on fitting day can stall every later stage.
Stage payments, allowances and changes
Look for stage payments tied to finished, checkable work, any provisional sums and what they assume, and how extras are authorised. A product allowance should state the amount it assumes so that your choices can be compared with it.
The figures to expect on your quote
- Weekdays: £95 an hour, with one hour as the minimum.
- Evenings and weekends: from £140 an hour.
Booked in advance means no call-out fee. An emergency visit can be requested at any hour of any day: a weekday daytime visit costs the hourly rate plus a £60 call-out, and an evening or weekend visit costs from £140 an hour plus £60. Parts are charged on top after you approve them, VAT is not added, and a written quote costs nothing. Last checked 28 November 2026; see what you pay.
Handover
Run every outlet, flush, fill and drain. Open access panels and look. Test valves for each fitting. Collect manuals, certificates, product references and photographs of concealed pipes; the handover documents guide lists them. Record defects with dates and agree when each will be revisited before the last payment, in line with what the quote said about any amount held back.
Related reading
For planning a refit, the neighbouring subjects are the order of work, how long a renovation takes, the labour share of a refit, a contingency for hidden work, coping while the bathroom is out of use and waste removal.
Approvals and rules come up in building notice or full plans, building control fees, electrical rules in bathrooms, extractor fan rules, VAT relief for adapted bathrooms and the Disabled Facilities Grant. Grants, tax and other money questions are grouped under costs.
The wider checklist is in what is included in a bathroom quote.
Questions people ask
How should a bathroom quote divide first fix from second fix?
First fix runs the new hot, cold, waste and heating pipes to their positions before walls and floors close. Second fix connects and tests the basin, toilet, bath, shower and radiator or towel rail.
Does a bathroom quote have to include electrics?
Not automatically. Ask who designs, installs and certifies any electrical work, and treat it as excluded until the quote names it.
Can a bathroom quote leave some prices open?
It can use provisional sums or product allowances. Ask what each one assumes and how a change to it is approved in writing.