The work
A repiping quote that can be compared fairly
A repiping quote should list the pipes to be replaced and those that stay, the routes, materials, opening up, reinstatement, shut-off periods and testing. Quotes are only comparable if every business prices the same routes, so write that scope first and send the same version to each. Repiping on weekdays is charged at £95 an hour of labour (minimum one hour), with materials on top.
Reasons people ask
Repeated leaks, old or unsuitable materials, poor flow, noisy pipes, a changed layout or exposed runs that need tidying. Poor flow can also come from a valve or the incoming supply, so ask for the cause to be checked before the whole system is condemned. If lead pipe is suspected, contact your water company, which can advise on testing and on its own section of the supply.
Define the boundaries
State where new pipe begins and ends: at the stop tap, the meter, the cylinder, each fitting. Record whether the heating circuit and wastes are included. Excluding them is fine if you know.
What the repiping quote should contain
| Heading | Detail wanted |
|---|---|
| Materials | Pipe type, size and joint method |
| Routes | Surface, floor void, loft or chased wall |
| Opening up | Locations and who reinstates |
| Insulation | Which runs, especially unheated spaces |
| Valves | Positions and labelling |
| Continuity | When water and heating are off |
| Testing | Pressure test and record |
| Unknowns | Assumptions and approval of extras |
Notice of structural limits matters too: joists should not be notched or drilled without regard to the building regulations guidance. Alterations to water systems in premises other than a house can require notice to the water supplier before work starts.
Partial replacement
Replacing only the worst runs can be sensible. Ask for the old and new joints to be marked on the sketch, with a note of any original pipe left in poor condition and why. That record lets a later quote start where this one stopped. If an electrical bonding connection is attached to pipe being removed or changed to plastic, an electrician should check it.
Living through it
Ask for a room-by-room sequence, the state of each room at the end of a day, where dust sheets go and whether a working toilet and cold tap remain. Occupied homes need this on paper more than the pipe sizes.
What to provide
A floor plan with fittings marked, photographs of exposed pipe, the stop tap and meter, known leak history and any planned renovation. In leasehold flats include the lease clause or consent process.
The figures to expect on your quote
- Weekdays: £95 an hour, with one hour as the minimum.
- Evenings and weekends: from £140 an hour.
Booked in advance means no call-out fee. An emergency visit can be requested at any hour of any day: a weekday daytime visit costs the hourly rate plus a £60 call-out, and an evening or weekend visit costs from £140 an hour plus £60. Parts are charged on top after you approve them, VAT is not added, and a written quote costs nothing. Last checked 28 November 2026; see what you pay.
Close-out
Before voids are closed, view the pipes, ask for the test result and photograph every run with a landmark in frame. Afterwards open each outlet to clear air, run several together, check joints and listen for knocking. Collect a marked-up sketch, product details and any certificate. Match payments to completed sections described in the quote.
Related reading
Documents worth settling around a longer job are a simple work agreement, work done without sign-off, selling without a certificate, how many quotes to gather and contract terms that may be unfair.
Hidden work is often priced as a provisional sum, so ask what any such figure assumes.
Questions people ask
Can a house be repiped in stages?
Yes, replacing the worst runs first can be sensible. Ask for old and new joints to be marked on a sketch, with a note of any poor pipe left in place and why.
Who makes good walls and floors after repiping?
Whoever the quote names. Ask it to list every location to be opened and who reinstates it, including plaster, boards, tiles and decoration.